04 / Construction
Your site doesn’t wait for the grid.
Site power delivered and installed, from cabins to machinery.
What’s at stake
Before grid connection, every day counts.
Your needs
- Short and long-term rental
- Site panels and distribution boxes
- On-site delivery and installation
- Fast breakdown repair
Context
Until the grid connection arrives, your site needs reliable power. We deliver, install and maintain generators sized for each phase, from site cabins to machinery.
Typical job
Long-term rental and site distribution boxes.
Detailed references on request, with our clients’ consent.
06 / Contact
A project. A breakdown. A question.
Free, no-obligation quote. A team in Agadir answers.
SPINELEC SARL · RC 11733 Agadir · ICE 001612166000074 · Since 2006