Quote

01 / Electrical installation

Electrical installation, from study to commissioning.

Low and medium voltage for industry, agriculture and commercial buildings.

FIG. 01 · Illustrative model.
01 / What we do

From MV substation to LV switchboard.

  1. Studies and sizing
  2. Switchboards and panels
  3. MV/LV substations
  4. Indoor and outdoor lighting
  5. Compliance upgrades and inspection
02 / How it works

Four steps, one team.

  1. Site survey

  2. Design and quote

  3. Installation

  4. Commissioning and handover file

03 / From grid to switchboard

From grid to switchboard.

We take power from the medium-voltage grid all the way to your outgoing circuits, with a generator on standby.

FIG. 02Principle diagram.SCALE NTSSingle-lineREV. 2026
05 / FAQ

Your questions, answered.

Do you work outside Agadir?

Yes, anywhere in Morocco. We are based in Agadir and work across the whole country.

Do you build MV/LV substations?

Yes: design, supply, installation and commissioning, through to the main LV switchboard.

Can you bring an existing installation up to standard?

Yes. We survey it first, then propose the work required.

06 / Contact

A project. A breakdown. A question.

Free, no-obligation quote. A team in Agadir answers.