02 / Generators

The right generator, at the right rating.

Standby, prime or off-grid power. We size, supply and install.

60kVA

Hotel, clinic, packing house

Indicative only. The exact rating comes from a load study.

01 / What we do

Supply, installation, commissioning.

  1. kVA sizing and advice
  2. Soundproofed and open sets
  3. Automatic transfer switches
  4. Installation, connection, commissioning
  5. Training for your staff
02 / How it works

Four steps, one team.

  1. Load study

  2. Choosing the set

  3. Installation and ATS

  4. Commissioning and training

03 / Standby or prime

Standby or prime.

Standby
Takes over during an outage, with an automatic transfer switch.
Prime
Powers an off-grid site, continuously.
06 / FAQ

Your questions, answered.

What rating do I need?

List the equipment to power; we carry out the load study and size the generator.

Standby or prime: what’s the difference?

A standby set takes over during an outage; a prime set powers a site with no grid. They are sized differently.

What is an automatic transfer switch?

It detects the outage, starts the generator and switches the load over, then returns to the grid when power comes back.

Do you train our staff?

Yes, at commissioning: start-up, routine checks and what to do when an alarm sounds.

07 / Contact

A project. A breakdown. A question.

Free, no-obligation quote. A team in Agadir answers.